Define The Use Case
Identify whether the project targets peak reduction, backup power, solar integration, grid revenues, or a combination. Review interval loads, tariffs, critical loads, and customer priorities.
Battery systems for customer savings, resilience, renewable integration, and grid-facing opportunities—evaluated against the intended operating strategy.
Discuss your opportunityIdentify whether the project targets peak reduction, backup power, solar integration, grid revenues, or a combination. Review interval loads, tariffs, critical loads, and customer priorities.
Evaluate power, duration, usable capacity, cycling, efficiency, degradation, and augmentation assumptions. Model dispatch and avoid double-counting revenues that compete for the same capacity.
Review footprint, access, setbacks, electrical connections, and equipment placement. Coordinate qualified engineering and early discussions with permitting and fire authorities.
Assess installed cost, warranty coverage, operating costs, insurance, revenue assumptions, and ownership structures. Run sensitivities on dispatch, degradation, and future costs.
Coordinate interconnection, permits, engineering, equipment procurement, controls, and EPC partners. Align installation and testing with the project’s approved operating limits.
Verify controls, protection, dispatch, monitoring, and handoff requirements. Establish operating responsibilities, maintenance plans, and performance reporting.
Start with your goals, your current position, and the opportunity you want to evaluate.
Each engagement is scoped to your project, location, and goals. Engineering, permitting, financing, and transaction requirements are evaluated for the specific opportunity.